Andrews Sykes provides package AC unit for rig refurbishments
One of the major oil & gas companies in the UAE required some urgent work to be conducted on a rig. The Engineering specialists were sent from Europe to conduct testing and commissioning on the LV room and control panels. This task was required to be conducted in the middle of summer where temperatures were still 35+ degrees Celsius.
As the Engineers did not have time to acclimatize to the extreme temperatures, Andrews Sykes was requested to provide an immediate solution that could be mobilized at short notice.