Less frequent service schedule over long periods of time, chilled water system can lose efficiency and become ineffective – this create chances of it breaking down completely. When a well-known tube manufacturing and re-tubing company in Dubai suffered chiller failure at their Jebel Ali depot, an emergency chiller rental was necessary to keep staff and the machineries to work comfortable on site.
Client admitted, their existing unit was very old and less effective, so the eventual breakdown came as no surprise. Therefore, a quick solution was required to ensure their warehouse cooling facility to get restored. The warehouse space was overheating due to the large machineries and heat loads from small sized ovens.