Andrews Sykes Provides Temporary Cooling Solution for a HV Electrical Room
Andrews Sykes Climate Rental was contacted to provide temporary cooling for a high voltage electrical room of a big brand company, after temperature in their electrical room raised above 45°C even though the weather is winter already. This created an uncomfortable working environment for employees and so something needed to be done immediately.
The building chiller was not yet ready to be commissioned, also the chilled water pipelines needs to be chemical flushed. The delay in these procedures from the MEP contractors made the client to approach Andrews Sykes for a reliable temporary solution.